Success Stories
Sep 26, 24
In December 2008, a devastating environmental disaster occurred in Kinston, Tennessee.
The dam of a reservoir, which for years absorbed ash from the local coal-fired power station, ruptured under the load. Millions of cubic metres of black sludge poured over the region like a tidal wave, destroying houses and turning once-thriving local rivers into dead zones for fish.
This shocking event drew attention to the dangers of storing ash with a high water content and sparked an urgent discussion about safety and environmental protection.
Jul 12, 24
Tratolixo, Portugal’s largest waste management company, already had two Putzmeister lines and is now adding a third to increase production and as a back-up option.
Jul 10, 24
Compañía Minera Santa Luisa mechanises shotcrete thickness control with Geokret 2.0, Putzmeister's system based on scanning the sprayed surface, significantly improving the process
May 23, 24
Putzmeister stationary concrete pumps and stationary placing booms pump continuously to create massive caissons for an artifical island in the North Sea.
Feb 21, 24
Putzmeister Wetkret 5 is the new Putzmeister equipment that Lurpelan Tunneling has acquired for the support works of the tunnels through which the railway tracks that will serve as a link with our Portuguese neighbours will run.
Feb 16, 24
Modular construction 4.0. At the precast plant of Deutsche Modulhausfabrik GmbH (DMF), employees are reconceptualising construction with the production of Lechner cubes.
Feb 9, 24
This application describes the succcessful customization and integration of an RV16 hydraulic rotary distributor with an EQV squeeze valve at a waste management facility in Toronto, Canada.
Feb 9, 24
Founded in 1974, the Association’s objective is to create and guarantee a waste management process for the region that is both economically and ecologically sound. To this end, the Upper Franconia Waste Disposal Association (known in German as the Zweckverband für Abfallwirtschaft in Nordwest-Oberfranken or ZAW for short) operates the waste-to-energy plant in Coburg-Neuses, which thermally utilises the waste from over 260,000 residents, thereby generating electricity and district heating.
Dec 7, 23
The Fehmarnbelt Fixed Link project forms an important step to build the European transport network to connect Scandinavia with Central Europe.
In future the travelling time between Hamburg and Copenhagen will be cut down from 4.5 h down to 2.5 h and consequently reduces the CO2 emission for transportation.
Nov 29, 23
RWE Power AG, one of the leading suppliers of renewable energy across the globe, operates sewage sludge handling plants from various manufacturers at several sites as part of its Refinement business area. RWE once again selected a Putzmeister solution for expanding the plant in the
Goldenberg power station.
Oct 24, 23
The Msikaba bridge is a cable-stayed steel deck bridge currently under construction, spanning the Msikaba River, near Lusikisiki in the Eastern Cape
of South Africa. The Msikaba bridge is part of the N2 Wild Coast (N2WC) road-building project, which aims to improve the travel time between
Durban and East London for light and heavy freight.
May 4, 23
The advantage is producing reasonable priced cement to achieve an advantage over competitors.
Mar 9, 23
A full range of Putzmeister equipment, from stationary pumps to shotcrete robots, will be aiding in the expansion and modernisation work for the Lisbon Metro, the largest underground construction project in Portugal for decades.
Mar 9, 23
The Lainzer Tunnel a 8 miles (12.8 km) railway tunnel in Vienna was slated to connect the Westbahn (western railway) with the Südbahn (southern railway) and the Donauländebahn railway from December 2012. The idea was to increase the capacity of the east-west transit system.
Mar 9, 23
The Jin Mao Building or the Jin Mao Towers, when translated, literally means the Golden Prosperity Building. When completed in 1999, it was amongst the tallest buildings of the world.
The design of the firm draws from traditional Chinese architecture such as the tiered Pagoda, gently stepping back to create a rhythmic pattern as it rises. The mixed use building contains a shopping mall, food court, offices, restaurants, night clubs and the one of the world’s tallest hotels - The Grand Hyatt Hotel, Shanghai.
Mar 9, 23
It was a dream that defied not just gravity but the frontiers of audacity in the sheer scale and ambition of architecture.
Mar 9, 23
Directly in front of Zurich Airport, Flughafen Zürich AG and Swiss Life are investing a billion Swiss francs into the new business district “The Circle”.
Feb 28, 23
Along Europe's longest national highway, there is a 5.7 miles (9.1 km) section between La Herradura and Taramay that connects the cities of Cádiz and Gibraltar in the South of the Iberian Pensinsula and Barcelona in the North East.
Sep 8, 22
The Plutonic Gold Mine belongs to the Canadian Barrick Gold Corporation, i.e. the second largest gold producer in the world. It is located in the Australian outback, approx. 950 km north-east of Perth, where temperatures between 5 and 50 °C are common.
Sep 8, 22
The co-incineration of mechanically de-watered sewage sludge in existing coal-fuelled power stations with highly effective flue gas pollution control is an economic and sensible alternative
to the above mentioned, environmentally harmful disposal methods.
Sep 8, 22
The disposal of dewatered sewage sludge is an important point nowadays in refuse disposal. A very environmentally-friendly and favourably-priced possible disposal is burning it along with dewatered sewage sludge in household waste incinerators.
Sep 8, 22
AHA Hannover is operating its organic waste treatment plant since the year 2005.
May 23, 22
A plant for the co-incineration of sewage sludge was installed at the Kassel power station in 2016.
May 10, 22
The SMITRED plant is located in Pluzunet, France. Sewage sludge from external suppliers is co-incinerated with about 50,000 tons/year of household waste.
May 10, 22
2014 saw the commissioning of the huge sewage sludge incineration plant in Tuen Mun, Hong Kong.
Apr 12, 22
The Steinhäule sewage treatment plant association was set up in 1984 and its members include 11 towns and communities around Ulm/Neu-Ulm in Southern Germany.
Mar 17, 20
After a planning and manufacturing period of three years, the first foundation for the new offshore wind farm EnBW Baltic 2 was laid in August 2013, marking the start of the construction phase.