Powering India’s Highway Revolution with Dwarka Expressway

May 23, 25

How the MT 1.0 Batching Plant Helped Build Asia’s First 8-Lane Single-Pier Flyover

 

  A large cement plant with a slideAI-generated content may be incorrect.

 

About the Project-

The Putzmeister MT 1.0 Batching Plant played a pivotal role in the construction of Package 3 of the Dwarka Expressway, India’s prestigious infrastructure project. Commonly known as the Northern Peripheral Road, this expressway features Asia’s first single-pier, 8-lane flyover, a symbol of the country's engineering excellence.

Located in Gurugram, Haryana, this high-scale project was executed by L&T with the equipment support provided by JRS Infrastructure, a leading construction equipment rental agency.


Challenges/ History-

With a colossal concrete requirement of over 600,000 m³, the project demanded:

  1. High-volume concrete production
  2. Consistent quality across grades (M10–M50)
  3. Rapid deployment and reliable uptime
  4. Tight project timelines with a deadline of November 2020

Solution-

The project used the Putzmeister MT 1.0 (Skip & Compartment Bin variant) with:
 

  1. Twin-shaft mixer for consistent homogeneity
  2. Automated SCADA system for real-time control
  3. Modular design for quick installation and relocation
  4. Configured with 4 aggregates, 4 cement silos, 1 fly ash silo, and automated admixture & water systems

A group of silos in a fieldAI-generated content may be incorrect.  A person holding a tabletAI-generated content may be incorrect.

 

Result- 

  1. Peak production of 456 m³ in just two shifts
  2. 9,000 m³ output in the best-performing month
  3. A cumulative 90,000 m³ produced over 2,500 hours of operation          

Highlights-

 ✅ Installed in January 2019
 ✅ Reliable operations across high-grade concrete mixes (up to M50)
 ✅ SCADA-enabled precision & performance monitoring
 ✅ Highest uptime and hassle-free operations even in tight schedules
 ✅ Contributed to timely and quality construction of a national landmark
 

Why Customers Trust Putzmeister

  • Proven Expertise & Industry Leadership

With decades of experience and a track record of market leadership, Putzmeister delivers smart, reliable, and performance-driven solutions trusted across the industry.

 

  • Commitment to Quality & Uptime

Our dependable supply of genuine spare parts ensures minimal downtime and maximum operational continuity — keeping your projects on track.

 

  • Designed for Simplicity & Efficiency

The innovative pump solution with a top-mounted hopper ensures easier handling and faster cleaning, making day-to-day operations smoother and more efficient.

 

Download Jobsite report