Presentation of the new M 46 with diagonal substructure TRDI and the new 4 section arm for more flexibility on construction sites.
Development of the Ergonic Boom Control (EBC). The pump driver controls now all boom movements with just one joy stick.
The new M 36 with Z-folding is introduced on Bauma 2001 in Munich.
2002
Introduction of the M 58 on substructure TRDV 250 mounted on a 6-axle-chassis for the US market.
Development of the MX 39 stationary placing boom without counterweight for deployment in a land recovery project in Japan, likewise an MX 38 without counterweight.
Further development of the trailer concrete pump BSA 1002 Multi as an all-round machine for delivering concrete and for synchronised wet concrete spraying.
2003
Successful market launch of the BSA 702, a machine for delivering fine-grained concrete, self-levelling screed and for wet spray jobs.
Further development of the EOC (Ergonic Output Control) for concrete pumps.
Co-operation with the Swiss group SIKA AG and re-development of the former Wetkret WKM now SIKA-PM 500 as a tunnel spray machine.
Development of the Autocor (Automatic Concrete placing on Rail) machine for pre-fabricated jobs.
Introduction of the new worm pump SP 11 Beliso.
The high-pressure pump HSP 25.100 was re-developed for use in the mining sector.
2004
Introduction of further elements in control systems such as the EPS (Ergonic Pump System) and the core pump HLS, a large-volume double-piston pump with a delivery cylinder diameter of 250 mm in truck-mounted concrete pumps.
Introduction of the 6-sectioned M 62.
2005
Reorganisation of the Putzmeister AG into 4 business areas Concrete Technology (PCT), Mortar Technology (PMT), Water Technology (PWT) and Industry Technology (PIT).
PM gets the order to deliver machines, placing booms and delivery pipelines for the Burj Dubai. For this a new super high pressure pump BSA 14000 SHPD for concrete pressure over 300 bars has to be developed.
Introduction of the M 20-4 and the M 42-5.
Continued development of the tried and tested Telebelt TB 105 in a new TB 110.
Introduction of a PUMI 31.89 S, a PUMI with a placing boom of 31m.
Development of the Triplex pump of the conveying of mineral raw materials.